Lord Road (Semlinger Rd to Loop 410) & Copernicus Park Parking Lot Expansion

Lord Road project consists of new construction of approximately 560 linear feet of 30’ wide roadway pavement, 4’ sidewalks and curb on both sides. The construction includes approximately 520 feet of new gas line, 520 feet of new 8” water main and 75 feet of new 8” sanitary sewer main as part of the project work. The Copernicus Park portion consists of the new construction of a parking lot, expansion of 40 new spaces, approximately 300 feet of trail realignment, landscaping and irrigation relocation.

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

David M. McBeth, P.E. – Capital Improvements Management Services

“Bain Medina Bain has served as the lead design consultant for the Rip Rap 69 Phase IID project that is currently under construction for the City of San Antonio. This assignment is considered a large and complex design project that includes the reconstruction of multiple blocks of city streets in older residential neighborhoods. The design included streets, storm drainage and large channel and culvert design, sidewalks, driveways, water and sewer reconstruction. The overall project construction is valued at approximately $12.2 million dollars.

Bain Medina Bain