Riverwalk Capital Improvements

Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements

Riverwalk Capital Improvements

Utilizing topographic and LEICA Scanning Technology, BMB provided horizontal and vertical control surveying services and 3D representations in these specific areas:

  • Area 8 – La Mansion, Navarro Street Stairs (660 ft.), and South Bank (400 ft.)
  • Area 9 – West Bank, South of Pedestrian Bridge of Crockett (320 ft.)
  • Area 10a & b – Market Street Pedestrian Bridge street level to Hilton (620 ft.)
  • Area 11 – S Presa Bridge to W of Navarro Bridge, Wedding Island and street access (420 ft.)
  • Area 12 – Chamber of Commerce Bldg. river bank, pedestrian bridges at river fork and street level of Commerce Street
  • Area 13-20 – River Bend and River Extension, Market Bridge to Alamo Bridge, Inner Loop from N Flood Gate to The South Bank Complex

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

Capital Improvements Management Services Department

“I wanted to thank you and your staff for the good work you have done on numerous projects for the City of San Antonio. Your knowledge and experience with local issues has been a great asset to our engineers and project managers in the Capital Improvements Management Services Department.

Bain Medina Bain