Salado Creek Greenway Central Segment

Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
  • Salado Creek Greenway Central Segment
BMB provided civil services for approximately 3 miles of hike and bike trails and associated amenities along the Salado Creek. The Trail stretched from McAllister Park through Loop 410 to Eisenhauer Road. The primary objective focused efforts on analyzing the impact on the water surface elevation and pilot channels of two (2) main low water crossings and multiple tributary crossings located within the 100-year existing flood plain. The low water crossings directly crossed the Salado Creek and the tributaries of the Salado Creek. Challenges besides the low water crossings were taking the trail under Eisenhauer Road, Austin Highway. To accommodate this we designed around piers of the bridges and existing storm outfalls that had to be extended or bridged.

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

David M. McBeth, P.E. – Capital Improvements Management Services

“Bain Medina Bain has served as the lead design consultant for the Rip Rap 69 Phase IID project that is currently under construction for the City of San Antonio. This assignment is considered a large and complex design project that includes the reconstruction of multiple blocks of city streets in older residential neighborhoods. The design included streets, storm drainage and large channel and culvert design, sidewalks, driveways, water and sewer reconstruction. The overall project construction is valued at approximately $12.2 million dollars.

Bain Medina Bain